background image

Designated use

The CP field bus node CP-FB6-E documented in this
manual is designated exclusively for use as a slave on
the INTERBUS. Festo CP modules can be connected
to the field bus node CP-FB6-E. The specified limit
values for pressures, temperatures, electrical data, mo-
ments, etc. must be observed when additional commer-
cially-available components such as sensors and actua-
tors are connected.

Please comply also with national and local safety laws
and regulations.

Target group

This manual is directed exclusively at technicians who
are trained in control and automation technology and
who have experience in installing, commissioning, pro-
gramming and diagnosing INTERBUS slaves.

Information on this manual   

This manual contains specific information on the instal-
lation, commissioning, programming and diagnosis of
the CP field bus node 6 for INTERBUS.

Information on further CP modules can be found in the
relevant manual. This is summarized in Fig. 0/1.

Contents and general safety instructions 

CP FB6-E  9809c

V

Содержание Compact Performance CP-FB6-E

Страница 1: ...Compact Performance CP fieldbus node 6 Programming and diagnosis Fieldbus protocol INTERBUS...

Страница 2: ...stribution and utilization of this docu ment as well as the communication of its contents to others without expressed authorization is prohibited Of fenders will be held liable for the payment of dama...

Страница 3: ...Order no 165 206 Title Manual Designation P BE CP FB6 E GB Contents and general safety instructions II CP FB6 E 9809c...

Страница 4: ...s 1 16 1 7 Connecting the operating voltage 1 17 2 Commissioning 2 1 Preparing the CP system for operation on the INTERBUS 2 3 2 1 1 Operating voltage 2 3 2 1 2 Saving the string assignment 2 3 2 2 Pr...

Страница 5: ...tic bus LEDs 3 6 3 2 Testing the valves 3 8 3 3 Diagnosis via INTERBUS 3 10 3 3 1 Diagnostic status register 3 10 3 3 2 Periphery fault PF 3 11 3 4 Reaction to faults in the control system 3 12 A Tech...

Страница 6: ...mply also with national and local safety laws and regulations Target group This manual is directed exclusively at technicians who are trained in control and automation technology and who have experien...

Страница 7: ...d by a pictogram Danger categories A distinction is made between the following WARNING This means that personal injury tor damage to property may occur if these instructions are not observed CAUTION T...

Страница 8: ...onal movements of the connected actuators Electrostatically vulnerable components These will be damaged if you touch the contact sur faces This mark indicates activities which can be carried out in an...

Страница 9: ...rogramming and diagnosing CP valve terminal pneumatics CP modules electronics Contents Special information on commissioning programming and diagnosing related to the node used Information on fitting i...

Страница 10: ...ovide digital inputs outputs I Os Digital inputs and outputs Node CP field bus node with without field bus connection to which the I O modules are connected Save SAVE buttons Save the current string a...

Страница 11: ...Contents and general safety instructions X CP FB6 E 9809c...

Страница 12: ...Chapter 1 Installation 1 Installation CP FB6 E 9809c 1 1...

Страница 13: ...to optical fibre waveguide 1 10 1 4 2 Non floating remote bus 1 11 Connecting the incoming remote bus 1 12 Connecting the continuing remote field bus 1 13 1 5 Connection to the installation remote bu...

Страница 14: ...of the connected actuators undefined switching states of the electronic components CAUTION The node of the CP system contains electrostatically vulnerable components Do not therefore touch any compon...

Страница 15: ...oning Set switch 4 to the position relevant to your controller see manufacturer specific addressing During operation Do not modify the setting of the DIL switch In this way you can avoid undesired rea...

Страница 16: ...1 Valve test ON CP system start without valve test OFF CP system start with valve test operation see chapter 3 2 2 Select common error messages periphery messages OFF all error messages are transmitt...

Страница 17: ...he field bus for the valve terminal One of these connections is intended for the incoming cable the other for the continuing field bus cable 1 2 INTERBUS interface incoming INTERBUS interface continui...

Страница 18: ...e suppression via RC network or con nection to optical fibre waveguide Non floating structure interference suppression via earthing on both sides Possible connection variants Connection variants Remot...

Страница 19: ...the screening shielding of the bus cable is conducted to earth on one side via the RC network on the other side however it is earthed via the screening sleeve of a metal plug Any equalizing currents o...

Страница 20: ...es the electromagnetic inter ference through the screening shielding of the bus cable is earthed on both sides via the screening sleeve of a metal plug A star shaped low impedance earthing or potentia...

Страница 21: ...btainable from Phoenix Contact GmbH Co Postfach 1341 32 819 Blomberg Germany Article IBS SYS INST UM Order no 27 54 28 6 Connecting to optical fibre waveguide Connection to the bus can also be made wi...

Страница 22: ...remote bus The plugs or sockets and cables listed below can be obtained from the suppliers quoted The plugs or sockets are suitable only for the cables named here You must order different plugs if yo...

Страница 23: ...D Reference conductor Sleeve Screening Screening shielding Do not connect pins not listed here Plug selection Part no 9 pin plug with socket insert screened shielded with sleeve housing Possible desig...

Страница 24: ...n 5 Sleeve Screening Screening shielding Do not connect pins not listed here Pin selection Part no 9 pin plug with pin insert screened shielded with sleeve housing Possible designs a straight socket b...

Страница 25: ...mote bus 7 24 V Supply to installation remote bus 8 0 V Supply to installation remote bus Sleeve Screening Screening shielding Do not connect pins not listed here Plug selection Part no 9 pin plug wit...

Страница 26: ...remote bus 8 0 V Supply to installation remote bus 9 RBST Create bridge to pin 5 Sleeve Screening Screening shielding Plug selection Part no 9 pin plug with socket insert screened shielded with sleeve...

Страница 27: ...P modules to a string The total cable length on one string must not exceed 10 m You thereby avoid faults in data exchange between the node and the connected CP modules Information on this procedure ca...

Страница 28: ...k By using PELV power units protection against electric shock protection against direct and indirect contact in accordance with EN 60204 1 IEC 204 is guaranteed on Festo valve terminals Safety transfo...

Страница 29: ...1 Installation 1 18 CP FB6 E 9809c...

Страница 30: ...Chapter 2 Commissioning 2 Commissioning CP FB6 E 9809c 2 1...

Страница 31: ...2 8 2 2 3 Bus configuration without CMD software 2 12 Logical addressing 2 12 Physical addressing 2 15 Ascertaining the number of bits for the process data channel per CP system 2 16 2 3 Commissioning...

Страница 32: ...ply further INTERBUS slaves 2 1 2 Saving the string assignment PLEASE NOTE Before commissioning the CP system you must first prepare the CP system see CP System manual Before commissioning the CP syst...

Страница 33: ...son between the NOMINAL and ACTUAL configurations in order to detect any addressing errors Access these specifications during a syntax check of a program in order to avoid addressing errors Configurat...

Страница 34: ...n the relevant manual for the CMD software It is assumed here that the user is already familiar with the information in the CMD manual PLEASE NOTE The software packages are subjected to modifications...

Страница 35: ...the Ident code Proceed as follows Open the dialogue window of the INTERBUS modu le Select the option Inserting with the Ident code Fig 2 1 Inserting bus slaves with the Ident code 2 Commissioning 2 6...

Страница 36: ...utputs on your CP system The last used string is decisive here see CP system manual CP system last used string Equipment on CP system assigned address range Process data channel bits 0 Up to 16 inputs...

Страница 37: ...ialogue window below you can describe the slave and enter information about the valve terminal e g the name of the station and a picture of the slave Fig 2 3 Dialogue window Insert Device Description...

Страница 38: ...types Remote bus or Installation remote bus Icon Open the dialogue window Icon if you wish to use specific icons for the Festo CP system PLEASE NOTE The specific icons for the Festo valve terminals ca...

Страница 39: ...Proceed as follows Use the box Select to select the file Festo ICL Mark the icon which corresponds to your CP system Transfer the icon with OK The icons are numbered The following table shows the rel...

Страница 40: ...with valves and or outputs 4 Type 02 with inputs and outputs 5 Type 02 only with valves 6 Type 10 with INTERBUS Loop When all the entries have been completed the CP sys tem will be integrated into you...

Страница 41: ...ID CODE Always configure a CP system with inputs and outputs1 with Ident code 3 1 Valve coils and or electrical outputs One or more configuration lists have been created in the PLC or in the INTERBUS...

Страница 42: ...t used string is decisive here see CP system manual Ascertain the required number of bits for the process data channel according to the following table Ascertaining the ID code and process data channe...

Страница 43: ...system ID code Process data channel bits I O address IN OUT String 0 16 outputs and 16 electrical inputs 3 48 O 20 0 21 7 I 20 0 21 7 String 1 reserved O 22 0 23 7 I 22 0 23 7 String 2 16 outputs and...

Страница 44: ...is address the appropriate number of bits in the process data channel of all the slaves This process must be carried out separately for the inputs and the outputs PLEASE NOTE The number of inputs on a...

Страница 45: ...1 2 3 3 3 3 3 16 32 48 64 16 inputs outputs 32 inputs outputs 48 inputs outputs 64 inputs outputs Example Calculating the physical addresses 1st CP system 2nd CP system 3rd CP system 4th CP system Pro...

Страница 46: ...ating voltage for the master module When you switch your controller on it will automatically carry out a comparison between the NOMINAL and AC TUAL configurations For this configuration run it is im p...

Страница 47: ...This will lead to an error message because of the factory setting of the DIL switch Recommendation If the safety concept of your machine system permits commission the CP system with both operating vo...

Страница 48: ...ERBUS or compatible bus systems depends principally on the INTERBUS module and your control ler CAUTION There are different address assignments on the INTERBUS This is due to the assignment of the pro...

Страница 49: ...utput byte byte n is mapped on valve coils 8 15 of the valve terminal byte n 1 is mapped on coils 0 7 In the following chapters you will find instructions on modifying the position of the low bytes an...

Страница 50: ...data word is composed The factory setting is OFF Siemens mode CAUTION When replacing a CP field bus node CP FB6 E make sure that the DIL switch is correctly set You thereby avoid errors in addressing...

Страница 51: ...A E Output Input Fig 2 7 Address assignment of the outputs and inputs in Siemens mode on the INTERBUS A0 A15 E0 E15 A16 A31 E16 E31 A32 A47 E32 E47 A48 A63 E48 E63 2 Commissioning 2 22 CP FB6 E 9809c...

Страница 52: ...be swapped CAUTION When replacing a CP field bus node CP FB6 E make sure that the DIL switch is correctly set You thereby avoid errors in addressing the inputs out puts Standard mode structure of proc...

Страница 53: ...in the con figured address range In order to do this proceed as follows Insert a valve terminal into your bus structure necessary steps see section 2 2 2 Bus configura tion via the CMD software Use th...

Страница 54: ...determine the I O addresses in the following dialogue window example Siemens mode byte by byte assignment for an S5 Fig 2 10 Entering process data example of Siemens mode 2 Commissioning CP FB6 E 980...

Страница 55: ...I O assignment at bit level is only necess ary in special cases The following dialogue window shows the entries re quired for swapping the assignment of the high byte and the low byte example byte swa...

Страница 56: ...ed Periphery faults PF If a fault is recognized by the CP system a periphery fault will also be triggered transmitted to the module and displayed there The causes of the fault in the CP system can how...

Страница 57: ...of the valve terminal is without voltage This is al ways the case when the load voltage is not switched on until after the power up phase of the controller Due to the factory setting of DIL switch el...

Страница 58: ...Chapter 3 Diagnosis 3 Diagnosis CP FB6 E 9809c 3 1...

Страница 59: ...age POWER or POWER V 3 5 3 1 4 Diagnostic bus LEDs 3 6 3 2 Testing the valves 3 8 Starting the test routine 3 9 Stopping the test routine 3 9 3 3 Diagnosis via INTERBUS 3 10 3 3 1 Diagnostic status re...

Страница 60: ...isplays on the bus node The LEDs on the node permit fast on the spot diag nosis 1 2 3 INTERBUS specific LEDs Operating voltage LEDs String LEDs Fig 3 1 LEDs of CP node FB6 1 2 3 3 Diagnosis CP FB6 E 9...

Страница 61: ...e is applied to pin 1 and the node is ready to operate POWER V Operating voltage display of valves Lights up when operating voltage is OK pin 2 0 3 CP string LED In starting phase blinks if the string...

Страница 62: ...rror message of the LEDs RC BA RD None Check the compressed air supply pilot exhaust channels See error message of the LEDs RC BA RD POWER POWER V Operating voltage of the outputs pin 2 not in toleran...

Страница 63: ...ervicing required RC BA RD String x Valve test mode is switched on or string assignment of CP system has been modified Exit the self test by switching off the operating voltage or check correct string...

Страница 64: ...TERBUS not active By pressing the SAVE button you can change the address length of the CP system compared with the last saved Switch off the operating voltage and then switch on again When switched on...

Страница 65: ...ovements of the actuators CAUTION This test function runs automatically in the CP valve terminals All valves are switched on off cyclically All programmed interlocks or continue conditions are ignored...

Страница 66: ...s 1 and 2 7 Set DIL switch element 1 to ON within 5 seconds If the 5 second interval is exceeded the CP valve ter minal CP system will resume normal operation Then switch on the operating voltage at t...

Страница 67: ...ontains the following diagnostic information n n 1 7 0 7 6 5 4 3 2 1 0 USER User fault parametrizing PF Periphery fault e g valve terminal BUS Bus fault CTRL Fault in module hardware DETECT Diagnostic...

Страница 68: ...or Errors 1 and 2 are not transmitted 1 Voltages for valves below tolerance 21 6 V 2 Voltage for valves switched off e g EMERGENCY STOP Factory setting All errors 1 5 are transmitted 3 Supply to input...

Страница 69: ...terruption of the field bus cable all outputs valves and electrical outputs will be switched off after 25 ms With programmed INTERBUS reset or processor reset all outputs valves and electrical outputs...

Страница 70: ...Appendix A Technical appendix A Technical appendix CP FB6 E 9808c A 1...

Страница 71: ...Contents A Technical appendix A 1 Technical specifications of the field bus node CP FB6 E A 3 A 2 Index A 5 A Technical appendix A 2 CP FB6 E 9808c...

Страница 72: ...tromagnetic compatibility interference emission tested as per EN 55011 resistance to interference tested as per EN 50082 2 Limit values class A Fieldbus node CP FB6 E can also be used with individual...

Страница 73: ...1 2 Table of current consumption Residual ripple 4 Vpp within tolerance Power failure bridging time 20 ms Operating voltage Solenoid valves of CP terminal Pin 2 Operating voltage connection rated val...

Страница 74: ...ing the ID code 2 13 Ascertaining the process data channel bits 2 13 B Bus LEDs diagnosis 3 6 Byte swap 2 21 C Configuration list 2 4 creating 2 4 Configuration run 2 17 Connecting INTERBUS interface...

Страница 75: ...eatment 3 10 F Faults field bus 3 12 PLC 3 12 Floating structure 1 8 I Information on this manual V Installation remote bus connection 1 14 continuing 1 15 incoming 1 14 non floating 1 14 INTERBUS add...

Страница 76: ...21 N Nominal actual configurations 2 4 Non floating remote bus 1 11 Non floating structure 1 9 O Operating status 3 4 Operating voltage CP system 2 3 P Physical addresses calculating 2 16 Physical ad...

Страница 77: ...1 13 S SAVE string assignment 2 3 Screening shielding variants 1 7 Siemens settings 1 4 2 3 String assignment saving 2 3 Switching status valves 3 8 T Target group V Technical specifications A 3 Test...

Отзывы: