Starting the test routine
1. Switch off the operating voltages (pins 1 and 2) at
the node.
2. Switch off the operating voltages at the output
modules.
3. Remove the DIL switch cover.
4. Note the settings of the DIL switch.
5. Set DIL switch element 1 to OFF.
6. Switch on the operating voltages (pins 1 and 2).
7. Set DIL switch element 1 to ON within 5 seconds.
If the 5 second interval is exceeded, the CP valve ter-
minal/CP system will resume normal operation.
Then switch on the operating voltage at the output
modules again.
Stopping the test routine
1. Switch off the operating voltages (pins 1 and 2) of
the terminal.
As DIL switch element 1 is set to
ON = Test routine off
the CP system will start again when the power is
switched on without the test routine.
3. Diagnosis
CP FB6-E 9809c
3-9
Содержание Compact Performance CP-FB6-E
Страница 1: ...Compact Performance CP fieldbus node 6 Programming and diagnosis Fieldbus protocol INTERBUS...
Страница 11: ...Contents and general safety instructions X CP FB6 E 9809c...
Страница 12: ...Chapter 1 Installation 1 Installation CP FB6 E 9809c 1 1...
Страница 29: ...1 Installation 1 18 CP FB6 E 9809c...
Страница 30: ...Chapter 2 Commissioning 2 Commissioning CP FB6 E 9809c 2 1...
Страница 58: ...Chapter 3 Diagnosis 3 Diagnosis CP FB6 E 9809c 3 1...
Страница 70: ...Appendix A Technical appendix A Technical appendix CP FB6 E 9808c A 1...