FCI WATERMAKERS, INC.
19
Pre-Installation
PIPING & INSTRUMENTATION DIAGRAM
Figure 3: Piping & Instrumentation Diagram
shows the piping and interconnect of the components,
including standard and optional accessory configurations. Determine
the pre-filtration and post-filtration components that were supplied
with your system, and identify how each component interconnects.
Pre-Filter
GAC
PI
PI
PS
PS
FM
HP Pump
Adjustable
Reject
Flow
Meter
Adjustable
Recycle
Flow Meter
Fresh Water Vessel Setup (1 or 2)
TDS Probe
Product
Flow Meter
Ultraviolet
To Ship’s Fresh
Water System
Ultraviolet
Check Valve
Product
Water
Tank
Ship’s Supply
Remineralization
Filter
GAC Filter
Bladder Tank
Fresh Water
Pump
Dock
Water
Inlet
Reject
Discharge
FM
FM
Check Valve
Ball Valve
2 Way Solenoid Valve
Flow Meter
Legend
FM
Pressure Gauge
PI
Pressure Switch
PS
Содержание DOCKSIDE TREATMENT SYSTEM PLUS Series
Страница 1: ...DOCKSIDE TREATMENT SYSTEM PLUS SERIES USER MANUAL INSTALLATION GUIDE...
Страница 2: ......
Страница 78: ...FCI WATERMAKERS INC 78 Revision History NOTES...
Страница 79: ......