Rev.23
7/311
1.4.
Installation, commisioning and service
The personnel in charge of installing, commissioning and maintaining this equipment must be qualified
and must be aware of the procedures for handling it. The product documentation should be read before
installing, commissioning or carrying out maintenance work on the equipment.
Personnel should take specific protection measures to avoid the risk of electronic discharge when
access is unlocked on the rear part of the equipment.
In order to guarantee safety, the crimp terminal and a suitable tool must be used to meet isolation
requirements on the terminal strip. Crimped terminations must be used for the voltage and current
connections.
It is necessary to connect the equipment to earth through the corresponding terminal, using the shortest
possible cable. As well as guaranteeing safety for the personnel, this connection allows high frequency
noise to be evacuated directly to earth.
The following checks must be performed before the equipment is supplied:
• The rated voltage and polarity.
• The power rating of the CT circuit and the integrity of the connections.
• The integrity of the earth connection.
The equipment must be used within the stipulated electrical and environmental limits.
NOTE:
current transformer circuits: Do not open a live CT secondary circuit. The high voltage produced
as a result could damage the isolation and threaten lives.
1.5.
Storage
If the relays are not going to be installed immediately, they must be stored in a dust- and humidity free
environment after the visual inspection has been performed.
1.6.
Recycling
Before recycling the equipment, the capacitors should be discharged through the external terminals. All
electrical power sources should be removed before performing this operation to avoid the risk of
electrical discharge.
This product must be disposed of in a safe way. It should not be incinerated or brought into contact with
water sources like rivers, lakes, etc.
Содержание SIL B
Страница 1: ...EN_FANOXTD_MANU_SIL_Feeder_SILB_R023 Docx USER S MANUAL SIL B Feeder Relay...
Страница 8: ...www fanox com Rev 23 8 311 2 DIMENSIONS AND CONNECTION DIAGRAMS 2 1 Equipment front view...
Страница 9: ...www fanox com Rev 23 9 311 2 2 Equipment dimensions...
Страница 10: ...www fanox com Rev 23 10 311...
Страница 11: ...www fanox com Rev 23 11 311 2 3 Cut out pattern CUT OUT PATTERN...
Страница 12: ...www fanox com Rev 23 12 311 2 4 Connection diagrams Analog connections...
Страница 13: ...www fanox com Rev 23 13 311...
Страница 14: ...www fanox com Rev 23 14 311 Digital connections Outputs and Trip circuit supervision...
Страница 15: ...www fanox com Rev 23 15 311 2 5 Terminals IEC 61850 or DNP3 0 protocols...
Страница 17: ...www fanox com Rev 23 17 311 IEC 60870 5 103 protocol...
Страница 25: ...www fanox com Rev 23 25 311 3 3 Functional diagram...
Страница 28: ...www fanox com Rev 23 28 311 3 5 1 SIL B 1 CHARGE CURVE 3 5 2 SIL B 5 CHARGE CURVE...
Страница 38: ...www fanox com Rev 23 38 311 4 6 4 Thermal protection curves This is the thermal curve for 3 minutes...
Страница 91: ...www fanox com Rev 23 91 311...
Страница 140: ...www fanox com Rev 23 140 311...
Страница 194: ...www fanox com Rev 23 194 311 Polarization V 35 0 V C Operating Angle 180 C Halfcone Angle 3 C...
Страница 307: ...www fanox com Rev 23 307 311 50BF init Fault init 79 Closure permission 52 closure permission...
Страница 308: ...www fanox com Rev 23 308 311 12 8 LED s configuration LEDs Blinking Latch Negate d LED On LED 1 LED 2 LED 3 LED 4 LED 5...
Страница 310: ...www fanox com Rev 23 310 311 NOTES...
Страница 311: ...www fanox com Rev 23 311 311...