The factory already installed the blind nuts during their assembly, so just apply
BTL and tighten. See figure 11 for a completed tailwheel assembly.
Figure 11
9. There are two ways to install the main landing gear (MLG). You can either put
the wheels/spats on first then bolt the MLG to the fuselage or bolt the MLG to the
fuselage and then install the wheel/spats. I think it is easier to install the wheels
and spats first. Locate all hardware for the wheel assembly, this will include the
tires/axles/wheel collars/spats/bolt. Insert the axle thru the pre-drilled hole then
install the washer and nylon insert nut, use BTL and tighten. See figure 12.
18
Содержание 110" YAK-54 V2
Страница 1: ...110 YAK 54 V2 Assembly Manual Copyright Extreme Flight 2015 1...
Страница 6: ...Here are the included kit components Hardware packages 6...
Страница 10: ...10...
Страница 12: ...Figure 4 5 25 inner aileron slot Figure 5 7 5 outer aileron slot 12...
Страница 23: ...Figure 16 23...
Страница 27: ...Figure 21 27...
Страница 30: ...Figure 25 30...
Страница 40: ...Figure 36 Figure 37 40...