Page 9
C Copyright 2005 Exel Orbital
All Rights Reserved
1.
2.
3.
4.
5.
6.
Loading a Weld Schedule from the Main Memory
Select the desired weld schedule from
the Main Memory in the left column.
Select Load Schedule.
The selected weld schedule appears on
the screen.