Page 14
C Copyright 2005 Exel Orbital
All Rights Reserved
1.
2.
3.
4.
5.
6.
Creating a Weld Schedule - 4 Level Weld
From the LIBRARY screen touch CRE-
ATE SCHEDULE.
The above screen appears.
Enter the Material Type that will be
welded by touching the field and using
the QWRTY keypad that appears.
Fill in all the Material Fields.
Enter the Electrode Data and select the
electrode material from the pull down
menu. CHANGE AFTER alarms the op-
erator to change the electrode.
In the Levels category select the Weld
Type to be made.