Page 18
C Copyright 2005 Exel Orbital
All Rights Reserved
1.
2.
3.
4.
5.
6.
Viewing or Modifying a Schedule
From the WELD Screen touch the
SCHEDULE button
Enter the Programmer Password which
gives access to the weld schedule. See
Pass Words in the Utility Section.
The first screen to appear is Schedule
Screen 1. Click the Right Arrow to move
to Schedule Screen 2
Click the Left Arrow to move back to
Schedule Screen 1