SFC
Maintenance
7.
223
14
Screw the cap back on (DEPOLOX
®
5 only).
15
Fill half a cap from the plastic bottle with cell sand and pour it
into the cell body (approx. 1/2 cm³ cell sand) (see 5.3.2 “Pour
in the cell sand (only with DEPOLOX
16
Reinsert electrodes.
17
Reopen the check valve on the sample water inlet and outlet
(pressurized version).
18
Perform the zero-point calibration after approximately three
hours running-in time.
Please note
You must calibrate each time the cell sand is replaced.
The calibration must be checked after one day.
Please note
We recommend checking and, if necessary, replacing the
electrodes and diaphragms when replacing the cell sand (see
“Replacing electrolyte, reference electrode and diaphragms
(DEPOLOX
Check electrolyte level of the 3-
electrode cell DEPOLOX
®
5
1
Check whether the potassium electrolyte is filled approx. 3 cm
over the water level (narrowing of the KCL container) and
replenish, if necessary.
To do this, remove the plug in the upper part of the electrolyte
tank and inject the electrolyte (use the syringe in the
accessory set).
2
The diaphragms in the electrolyte tank form the connection
between the reference electrolytes and the sample water. If
the sample water quality is poor (e.g. high iron content), both
diaphragms in the electrolyte housing should be replaced. The
diaphragms should be white (any coloration is an indication
that the diaphragms are clogged and should be replaced).
3
Calibrate after approximately three hours.
Please note
The calibration must be checked after one day.
Содержание WALLACE & TIERNAN SFC
Страница 1: ...WALLACE TIERNAN MEASURING AND CONTROL SYSTEM SFC from version V 3 08 INSTRUCTION MANUAL...
Страница 2: ...2 WT 050 590 000 DE IM 0719 SFC Please note Original instruction manual...
Страница 40: ...40 WT 050 590 000 DE IM 0719 Description SFC 3...
Страница 118: ...118 WT 050 590 000 DE IM 0719 Functions SFC 4...
Страница 121: ...SFC Installation 5 121 Top hat rail assembly...
Страница 122: ...122 WT 050 590 000 DE IM 0719 Installation SFC 5 Wall mounting assembly...
Страница 123: ...SFC Installation 5 123 Top hat rail assembly...
Страница 124: ...124 WT 050 590 000 DE IM 0719 Installation SFC 5 Wall mounting assembly...
Страница 125: ...SFC Installation 5 125 Control cabinet installation assembly...
Страница 126: ...126 WT 050 590 000 DE IM 0719 Installation SFC 5 Control cabinet installation assembly...
Страница 127: ...SFC Installation 5 127 Installation of the front panel on the control cabinet...
Страница 128: ...128 WT 050 590 000 DE IM 0719 Installation SFC 5 Installation of the front panel on the control cabinet...
Страница 145: ...SFC Installation 5 145 Example 2 W2T505525 W3T171924 W2T505525 Only operate with sample water inlet...
Страница 156: ...156 WT 050 590 000 DE IM 0719 Installation SFC 5...
Страница 218: ...218 WT 050 590 000 DE IM 0719 Operation SFC 6...
Страница 232: ...232 WT 050 590 000 DE IM 0719 Maintenance SFC 7...
Страница 249: ...SFC Complete Units Retrofit Kits and Spare Parts 8 249 Drawing of DEPOLOX 5 pressurized version W3T170032 W3T170032...
Страница 253: ...SFC Complete Units Retrofit Kits and Spare Parts 8 253 VariaSens drawing non pressurized version W3T158742 W3T158742...
Страница 257: ...SFC Complete Units Retrofit Kits and Spare Parts 8 257 VariaSens drawing pressurized version W3T158756 W3T158756...
Страница 263: ...SFC Complete Units Retrofit Kits and Spare Parts 8 263 Drawing of DEPOLOX Pool pressurized version W3T158599 W3T158599...
Страница 266: ...266 WT 050 590 000 DE IM 0719 Complete Units Retrofit Kits and Spare Parts SFC 8...
Страница 273: ...SFC Declarations and certificates 10 273 10 Declarations and certificates 10 1 Declaration of Conformity...
Страница 274: ...274 WT 050 590 000 DE IM 0719 Declarations and certificates SFC 10...
Страница 275: ...SFC Declarations and certificates 10 275 10 2 Certificate of Compliance...
Страница 276: ...276 WT 050 590 000 DE IM 0719 Declarations and certificates SFC 10...
Страница 284: ...284 WT 050 590 000 DE IM 0719 Settings Table SFC 11...