20
|
Eveready® Energy Vault [AS1 and B1] –
System Connection Diagrams
Case 2 – Digital Meters only
If the
Eveready
®
Energy Vault AS1
system is installed on a site with a multi-phase
service connection, it shall employ digital meters to measure grid import/export
and solar generation. The system is connected as per the below schematic. Note,
the Back-Up (UPS) feature is applicable only for End-Users that have opted for
Blackout Protection
at the time of purchase.
Fig. 6. Eveready® Energy Vault - Digital Meter Connections
Back-Up Load
On-Grid Load