System Operation
– Eveready® Energy Vault [AS1 and B1]
|
17
Turn On Eveready® Energy Vault
If the
Eveready
®
Energy Vault primary unit
[AS1] is installed in a stand-alone
manner, the system shall be turned on as follows:
1.
Turn on the Main circuit breaker connected to the
Eveready
®
Energy Vault AS1
system (C20).
a.
If applicable, turn on any circuit breaker connected on the grid side.
2.
Turn on the DC switch located on the right-hand side of the
primary
unit.
3.
Turn on the battery switch, located on the right-hand side of the
primary
unit and
wait until the blue LED ring turns on.
4.
If Back-Up/UPS loads are connected, turn on respective AC circuit breakers.
a.
If applicable, turn on any circuit breaker connected on the Back-Up side.
If the
Eveready
®
Energy Vault
includes a combination of
primary
and
secondary
unit(s), the system shall be turned on as follows:
1.
Turn on the Main circuit breaker connected to the
Eveready
®
Energy Vault AS1
system (C20).
a.
If applicable, turn on any circuit breaker connected on the grid side.
2.
Turn on the DC switches for the
Eveready
®
Energy Vault
in a bottom-up sequence.
These are located on the right-hand side of the
primary
and
secondary
units.
For e.g., if there are 3x
secondary
units installed, then turn them on in the sequence
–
secondary
unit (No.3) > (No.2) > (No.1) >
primary
unit.
3.
Turn on the battery switches for the
Eveready
®
Energy Vault
in a bottom-up
sequence and wait until the blue LED switches off. These are located on the right-
hand side of the
primary
and
secondary
units
.
For e.g., if there are 3x
secondary
units installed, then turn them on in the sequence
–
secondary
unit (No.3) > (No.2) > (No.1) >
primary
unit
.
4.
Wait for 30 seconds and observe the LED Status Indicators
on the front of the
primary
unit. To view the running status of the system, refer to Table 3.
5.
If Back-Up/UPS loads are connected, turn off respective AC circuit breakers.
a.
If applicable, turn off any circuit breaker connected on the Back-Up side.
The
Eveready
®
Energy Vault AS1
system shall now conduct a series of internal
checks and resume normal operation.
Содержание AS1-3KS-10.2
Страница 1: ...User Manual AS1 3KS 5 1 B1 5 1 48 ENERGY VAULT...
Страница 2: ......
Страница 4: ...ii...
Страница 34: ...28 Safety Datasheet SDS First Aid Measures...
Страница 48: ......
Страница 57: ...Notes...
Страница 58: ......
Страница 59: ......
Страница 60: ...www evereadysolarstorage com ENERGY VAULT...