80
Tube flushing
Allows setting suction tube/drain flushing with air preventing possible formation of clots/occlusions in the tube.
To activate this function, press on the switch-shaped button until it turns green and the word
YES
appears.
When setting is complete, confirm with
OK
. The main menu will automatically appear.
2 - MANOMETER
-
Unit of measure selection
Press the
MANOMETER
pane to access the page where you can select the suction pressure unit of measure.
Scale
Allows changing the unit of measure adopted for the suction pressure.
To change the unit of measure, press on the arrows until reaching the desired unit of measure.
When setting is complete, confirm with
OK
. The main menu will automatically appear.
The operating page will show the pressure with the unit of measure selected.