Aquafilter
E9_Next_Ing_rev03 – 10/10/2018
47
E9 NEXT
7.7.10 Planning set up
Select the "
Planning
" icon. This will give the following two possibilities:
a)
Delayed start
b)
Test planning
a) Delayed start
It is possible to plan the start of a cycle or a test for a precise day and time.
The delayed start occurs if the autoclave is left on, with the door closed, and the water level above the
minimum.
On the set day and time, the autoclave automatically starts the planned cycle and/or test.
The following combinations are possible:
-Vacuum Test
-Bowie & Dick
-Helix Test
- Vacuum Test followed by the cycle
- Cycle
- Vacuum Test followed by Helix Test
- Vacuum Test followed by Bowie & Dick Test
If a Vacuum Test is planned, the autoclave only completes it if the machine is not hot. The next planned
cycle will only start if the Vacuum Test is successful.
To plan a delayed start follow the instructions in the figure:
Содержание E9 Next 18L
Страница 1: ...Instructions manual 0051 E9 Next...
Страница 49: ...Aquafilter E9_Next_Ing_rev03 10 10 2018 48 E9 NEXT...