Aquafilter
E9_Next_Ing_rev03 – 10/10/2018
21
E9 NEXT
Fig. 6.1-3
Fig. 6.1-4
6.2
INSTALLING THE UNIT
Installation is a fundamental operation for the subsequent use and correct functioning of the unit.
CAUTION: the unit MUST be installed by specialised technicians.
After installing the unit, always fill out the installation sheet.
Machine installation and start-up should be performed with the door open in order to
measure ambient pressure.
This unit has been designed for use in a normal environment (see chap. 5.3 “Technical data”); it is
necessary, however, to follow the instructions given below.
- Before installation, make sure to remove the kit of accessories from inside the unit.
- Install the unit so that the power lead does not kink or become squashed, but has a free run to the socket.
- The unit must be placed so that the plug is accessible.
-
Place the unit at a height that will allow the user to inspect the entire sterilization chamber and clean it
with ease.
-
Connect the overflow connector (1 of Fig. 5.1.2-1) to allow the autoclave to drain any excess water
formed due to faults.
- Do not place trays, newspapers, containers of liquids, etc. on the unit.
- Do not lean on the door when it is open.
- When emptying the discharge tank directly into the waste pipes, position the unit at a height above the
drains.
Once installed and connected to an electrical power point, the unit is ready to use.