![Esko Kongsberg V-Series Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/esko/kongsberg-v-series/kongsberg-v-series_user-manual_2427108033.webp)
8
Kongsberg V-series
8. Prepare for a Job
8.1 Introduction
Keep away from
Moving Parts
during operation.
Do not lean on
Racks
,
Guide Ways
or
Traverse
during operation, as this may
cause personal injury.
Before starting any operation, make sure that:
• The Table is free from obstructions
• No unauthorized personnel come close to the table
The
Starting Point
in this procedure is to
Create a Job
from a file already available in
My Jobs
List
.
Detailed information about the complete iPC workflow is available in the following manuals:
•
User Manual for i-cut Production Console
.
•
Get the best out of iPC 2.0
.
Here, a step by step procedure is provided that can be used as a check list.
8.2
Create Job
In
My Jobs List
, double-click a file.
My Job Actions
->
Create Job
.
A new
Job
is created based upon currently selected file in
My Jobs List
.
8.3
Layer Setup
Opened Job
->
Layers
.
Ensure proper
Layer Setup
.
33