
490725-05
7
3.4 Advisory screens
Advisory screens may be displayed before and during
a cycle.
Complete the actions requested to continue using the
autoclave.
There are three types of Advisory screen:
Fill water reservoir Section 4
Service screens
Section 10
Warning screens
Section 11
3.6 Water quality
The water reservoir must be filled with water of an
appropriate quality that is low in dissolved solids
and has a low microbial count - do not fill during a
running cycle.
We recommend the use of:
• water treated by the reverse osmosis
process
• distilled water
• deionised water
Refer to local authority requirements if in doubt.
• TDS (Total Dissolved Solids) to be less
than 7mg/l (milligrams per litre), or 7ppm
(parts per million)
• pH to be between 5.0 - 7.5
• conductivity <15 microSiemens/cm at
20°C
3.5 Autoclave manager
Appoint a staff member to be the Autoclave Manager.
The Autoclave Manager, who must be trained in the use
of the autoclave and will control autoclave use.
The Autoclave Manager is responsible for:
•
Ensuring all users are regularly trained in the use
and maintenance of the autoclave.
•
Maintaining a record of training attendance
including evidence of trainee understanding.
Refer to Section 13: “Security” to set up security PINS
and choose a security level for the autoclave.
Note: REMEMBER YOUR “MANAGER” PIN CODE!
A forgotten Manager PIN code will require a
Service call-out to access the menus.
3.3 The Progress screen
The Progress Screen indicates cycle progress, cycle
phase and cycle information (e.g. ambient temperature
and pressure).
To do this, a green circular progress bar is drawn on
the screen until it is completed for the selected cycle. At
this point the cycle ends.
When drying is deselected for a cycle, the progress bar
does not include the (orange) drying phase.
The phases of the cycle are indicated in the centre of
the progress screen, as follows:
Preconditioning Phase
Sterilisation Phase
Post Sterilisation Cooling Phase
Drying Phase
Two-minute indication
The autoclave marks the two-minute point in the
Sterilisation Phase for manual record keeping.
It displays the following, in order, to count down to the
two minute mark:
The two-minute mark has been reached the moment
2
is displayed.
2
2
SES 2010
09:00
ENABLING
DRYING
Cycle Type
Cycle No
Temp °C
Pressure kPa
Cycle Type
Cycle No
Temp °C
Pressure kPa
progress
bar
drying
phase
Содержание Little Sister SES 2010
Страница 41: ...Powered by TCPDF www tcpdf org 490725 05 41...