Instalacion_77.fm -
28/7/11
INSTALLATION
52
Installation manual
Connect the motor to the switchboard
Position the end cap and tighten the gland
Before making any electrical connections,
check the switchboard instructions manual.
We recommend using switchboard VIVO-D101(M).
1
Connect the operator (VUS) to the switchboard.
2
Connect the capacitor (C) in cable connectors Turn
1 and Turn 2.
3
Connect the closing limit switch (FCC).
The FCC allows the switchboard to distinguish
between a collision with an obstacle and with a
stopper on closing.
4
Connect the switchboard to the electricity supply.
5
Activate the power supply switch.
Before carrying out any gate movement,
ensure there is no person or object in the radius
of action of the gate and the drive mechanisms.
6
Use the switchboard mini-pushbuttons (CLOSE-
OPEN) to check the motor connections are correct
(turning direction).
If the turning direction is not correct,
interchange the cables 2 and 3.
Ensure the earth cable is properly connected.
1
Position the end cap (1) in its housing (2) and attach
using the screws (3).
2
Tighten the gland (4) to ensure the electrical cable
input (5) is seal tight.
G1
G2
G3
N
L
POWER
MOTOR1 (G2-G1-COM)
ST1
FT1
P1 P2 P3
ST2
FT2
P4 P5 P6
STOP
P7 P8
P11 P12
LOCK
FCA1
FCC1
P15 P14 P16
P22 P23
Courtesy
Light
Lamp.
G7 G8
G9 G10
24Vac
P140W1
N L
VIVO- M101:
230Vac/ 50Hz
VIVO- M101M:
125Vac/ 60Hz
1
Motor connection (common)
2
Motor connection (turning 1)
3
Motor connection (turning 2)
4
Earth
5
Safety device connection
6
Safety device connection
CLOSE OPEN
Содержание VULCAN S
Страница 2: ......
Страница 4: ...VULCAN STOC fm 17 2 09 VULCAN S ii VULCAN S...
Страница 95: ...VULCAN S book Page 1 Wednesday February 18 2009 11 01 AM...