Desemba
laje_77.fm -
28/7/11
42
Installation manual
UNPACKING AND CONTENT
1
UNPACKING
1
Open the package and remove the contents from
within.
}
Eliminate the packaging in an environmentally
friendly manner, using recycling containers.
Do not leave the packaging within the reach
of children or handicapped people, as it may
cause injury.
2
Check the content of the package (see figure
below).
Should it be noticed that a piece is missing or
deteriorated, contact the closest technical service.
2
CONTENT
Fig. 3
VULCAN S Operator Content
1
Gudgeon axles caps
2
Safety washers
3
Gudgeon vertical pin
(
ø
= 12mm, L = 37mm)
4
Gudgeon
5
Gudgeon horizontal pin
(
ø
= 10mm, L = 57.2mm)
6
Gland cover screws
7
Gland cover
8
Gland
9
Gland nut
10 Hydraulic motor body
11 Piston rod cover
12 Piston rod cover top
13 Piston rod cover tops
14 Piston rod cover rods
15 Front support bracket
16 Front support
17 Safety ring
18 Ball bearing joint
19 Ball bearing joint nut
20 Rear support
21 Rear support bracket
22 Faston terminals
Содержание VULCAN S
Страница 2: ......
Страница 4: ...VULCAN STOC fm 17 2 09 VULCAN S ii VULCAN S...
Страница 95: ...VULCAN S book Page 1 Wednesday February 18 2009 11 01 AM...