7 Acceptance/Protection Function Test Guide
7-58
L-PRO 4000 User Manual
D02706R02.30
79 Test Procedure:
1. Access
Utilities>Virtual Inputs.
2. Select Virtual Input 2 (“SCADA Close Breaker 1&2”).
3. Pulse On (This simulates a SCADA Breaker Close command.)
Observe the relay actions on the relay HMI:
Main Breaker Close and Aux Breaker Close
After 10 Seconds: External Trip (Time delay of ProLogic4)
After 2 Seconds: Main Breaker Reclose (Shot 1, T1)
After 8 Seconds: Auxiliary Breaker Close (Shot 1, TF)
After 2 Seconds: External Trip (PL4 – TF)
After 4 Seconds: Main Breaker Reclose (Shot 2, T2)
After 8 Seconds: Aux Breaker Close (Shot 2, TF)
After 2 Seconds: External Trip (PL4 – TF)
After 6 Seconds: Main Breaker Reclose (Shot 3, T3)
After 8 Seconds: Aux Breaker Close (Shot 3, TF)
After 2 Seconds: External Trip (PL4 – TF)
After 8 Seconds: Main Breaker Reclose (Shot 4, T4)
After 8 Seconds: Aux Breaker Close (Shot 4, TF)
After 2 Seconds: External Trip (PL4 – TF)
After 1.3 Seconds: Recloser Lockout (1.0 s Tp)
4. For detail of shot numbers, etc. observe the sequence of events by viewing
Main Menu>Events
5. To perform this test again, reset the Lockout as per 79 Reset Procedure
above, then repeat the 79 test procedure.
End of 79 test.
Содержание L-PRO 4000
Страница 1: ...L PRO 4000 Transmission Line Protection Relay User Manual Version 2 3 Rev 0...
Страница 2: ......
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 14: ......
Страница 40: ......
Страница 50: ......
Страница 116: ......
Страница 146: ......
Страница 218: ......
Страница 252: ...Appendix B IED Settings and Ranges Appendix B 34 L PRO 4000 User Manual D02706R02 30...
Страница 260: ......
Страница 270: ......
Страница 302: ......
Страница 308: ......
Страница 310: ......
Страница 311: ...D02706R02 30 L PRO 4000 User Manual Appendix K 1 Appendix K Function Logic Diagram Diagram in plastic sleeve...
Страница 312: ......