SC-F9200 Series
Revision B
MAINTENANCE
When left unused/transportation
372
SE Group Confidential (Related Staff Only)
5.3.2.3 Preparation after transportation (With replacing Ink
Tanks)
REQUIRED TOOLS
Stubby screwdriver
Screwdriver
Brand-new ink tank (x8)
Brand-new chip unit (x8)
Media (for nozzle checking)
Service program
Communication Driver
PROCEDURE
1.
Remove all the cleaning cartridges.
2.
Lower all the lock levers.
3.
Start the printer in the Serviceman Mode.
Turn on the printer while pressing
[Menu]
+
[Back]
+
[OK]
.
4.
Start the service program and select
Treatment for transfer (After transfer with
replacement Ink Tank)
from
ADJUSTMENT (Sequence).
5.
Select
Switch between Ink cartridges and Ink tanks
.
Select
All channels
and
Ink Tank
, and press the
[Run]
button to make the ink
tank available.
6.
Turn off the printer.
7.
Install the new ink tanks.
8.
Install the new chip units, and pour ink.
9.
Turn on the printer.
10. Start the service program and select
Procedure (After transfer with
replacement Ink Tank)
from
ADJUSTMENT (Sequence).
11. Select
Force charge.
Select all colors and press
[Run]
button to run Force charge.
12. Discard the waste ink.
13. Select
Initial ink charge
.
Select
All channels
, and press the
[Run]
button to run the initial ink charge.
14. Select
Nozzle Check
.
Select
Nozzle Check Pattern Print
, and press the
[Run]
button to run the nozzle
check.
15. Perform cleaning if necessary.
C H E C K
P O I N T
If two weeks or more has passed since the preparation before
transportation was carried out, install the new ink tank and new
chip
Within two weeks since the preparation, refer to
transportation (Without replacing Ink Tanks)
.
C H E C K
P O I N T
If two weeks or more has passed since the preparation before
transportation was carried out, install the new ink tank and new
chip
Содержание SC-F9200 series
Страница 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Страница 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Страница 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Страница 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Страница 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...