SC-F9200 Series
Revision B
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
248
SE Group Confidential (Related Staff Only)
7.
Disconnect all cables from the connectors on the Sub-F Board.
8.
Remove the four screws, and remove the Sub-F Board.
C)Silver M3x8 S-tite screw: 4 pcs
Figure 3-204. Removing the Sub-F Board
When installing the Sub-F Board, make sure to attach it in the
correct orientation as shown in
.
Insert the two tabs of the Right Reel Cover into the two
positioning holes on the frame.
Right Reel Cover
Tabs
C
C
C
C
Sub-F Board
Содержание SC-F9200 series
Страница 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Страница 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Страница 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Страница 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Страница 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...