SC-F9200 Series
Revision B
DISASSEMBLY & ASSEMBLY
Disassembly and Assembly Procedure
161
SE Group Confidential (Related Staff Only)
3.4.5.9 CR Motor
1.
2.
Remove the Media Loading Lever.
3.
Remove the Right Upper Cover.
4.
Remove the Left Rear Cover.
5.
Remove the Left Upper Cover.
6.
Remove the Left Cover.
7.
Remove the APG Unit.
8.
Loosen the two screws (A) that secure the pulley holder.
9.
Loosen the screw (B) to loosen the tension of the CR Timing Belt.
Figure 3-100. Loosening the CR Timing Belt Tension
A D J U S T M E N T
R E Q U I R E D
When replacing/removing this part, refer to
Items and the Order by Repaired Part” (p260)
and make sure to
perform the specified operations including required adjustment.
C H E C K
P O I N T
Before loosening the tension at the next step, mark the position of
the pulley holder to make the required adjustment easier.
A
B
A
- Left side -
Pulley Holder
Содержание SC-F9200 series
Страница 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Страница 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Страница 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Страница 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Страница 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...