SC-F9200 Series
Revision C
ADJUSTMENT
Other Printer Checks and Adjustments
363
SE Group Confidential (Related Staff Only)
x
4.
Loosen the three screws at home side.
Figure 4-87. AH Standard Adjustment (1)
5.
Lift the bottom of the Heater Frame by 10 mm.
Figure 4-88. AH Standard Adjustment (2)
6.
Attach the shims: two to screw (1) and four to screw (2).
7.
Tighten the three screws.
Figure 4-89. AH Standard Adjustment (3)
8.
Install the Sub-E Board Cover.
9.
Install the After Heater.
10. Measure the amount of deformation.
If the amount is between -2 to -1 mm: End of the adjustment.
If the amount is between -2.9 to -2.1 mm or between 1.1 mm to 1.9 mm:
Perform the AH Position Adjustment
C H E C K
P O I N T
The following procedure is described for the case of -5 mm
deformation.
Screw
Screw
Screw
Home side
Heater Frame
Shim
Home side
Shim
Heater Frame
Screw
Screw (1)
Screw (2)
Содержание SC-F9200 series
Страница 11: ...SE Group Confidential Related Staff Only C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 37: ...SE Group Confidential Related Staff Only C H A P T E R 2 TROUBLESHOOTING ...
Страница 76: ...SE Group Confidential Related Staff Only C H A P T E R 3 DISASSEMBLY ASSEMBLY ...
Страница 258: ...SE Group Confidential Related Staff Only C H A P T E R 4 ADJUSTMENT ...
Страница 365: ...SE Group Confidential Related Staff Only C H A P T E R 5 MAINTENANCE ...
Страница 389: ...SE Group Confidential Related Staff Only C H A P T E R 6 APPENDIX ...