5. Install rain cap and small diameter pipe assembly in Y concentric
fitting and large pipe assembly. Ensure small diameter pipe is
bottomed and cemented in Y concentric fitting.
6. Secure assembly to structure as shown in Figure 28 using field-
supplied metal strapping or equivalent support material.
note: ensure termination location clearance dimensions are
as shown in the diagrams found in figure 28 and 29. when
extending the length of the 4” pipe, the added length beyond
21-1/8” must be deducted from the maximum equivalent feet
of vent pipe.
note: If assembly needs to be extended to allow side wall
thickness requirement, the 2 pipes supplied in the kit may be
replaced by using same diameter, field-supplied SDR-26 PVC
(d2241) pipe. do not extend 21 1/8” dimension more than 60 in.
(see figure 28.)
Do not use field-supplied couplings to extend pipes. Airflow
restriction will occur and the heater pressure switch may cause
intermittent operation.
7. Cement heater combustion-air and vent pipes to concentric vent
termination assembly. See Figure 29 for proper pipe attachment.
8. Operate heater through 1 heat cycle to ensure combustion-air and
vent pipes are properly connected to concentric vent termination
connections.
fIGure 29.
MultI-concentrIc vent terMInatIons
When two or more appliances are direct vented with concentric
vent terminations near each other, each appliance must be
individually vented. NEVER common vent this appliance. When
two or more appliances are direct vented using concentric vent
terminations, the appliances may be vented as shown in Figure
30 and 31.
fIGure 30.
Concentric Vent Terminations
for Horizontal Direct Venting.
fIGure 31.
Concentric Vent Terminations for Vertical
Direct Venting through a roof.
Содержание 6G50100 series
Страница 5: ...5 general safety information ...
Страница 53: ...53 notes ...
Страница 54: ...54 notes ...
Страница 59: ...54 REMARQUES ...
Страница 60: ...53 REMARQUES ...