
Technical data
Proline t-mass A 150 HART
100
Hauser
Supply voltage
DC 24 V (18 to 30 V)
The power supply circuit must comply with SELV/PELV requirements.
Power consumption
Order code for
"Output"
Maximum power consumption
• Option
A
: 4-20mA HART
• Option
B
: 4-20mA HART, pulse/frequency/
switching output
• Option
K
: Pulse/frequency/switching output
3.1 W
Current consumption
Order code for
"Output"
Maximum current
consumption
Maximum switch-on
current
• Option
A
: 4-20mA HART
• Option
B
: 4-20mA HART, pulse/frequency/
switching output
• Option
K
: Pulse/frequency/switching output
185 mA
< 2.5 A
Power supply failure
• Totalizers stop at the last value measured.
• Configuration is retained in the device memory.
• Error messages (incl. total operated hours) are stored.
Electrical connection
Connecting the transmitter
2
1
*
1
2
23
22
24
25
26
27
A0017179
1
Cable entry for supply voltage
2
Cable entry for signal transmission
Potential equalization
No special measures for potential equalization are required.
Terminals
Plug-in screw terminals for specified wire cross-sections
Cable entries
• Cable gland: M20 × 1.5 with cable 6 to 12 mm (0.24 to 0.47 in)
• Thread for cable entry:
• NPT ½"
• G ½"
Cable specification
Wire cross-sectional area
0.5 to 1.5 mm
2
(21 to 16 AWG)
Содержание Proline t-mass A 150
Страница 133: ......
Страница 134: ...www addresses endress com...