Commissioning
Proline Promag L 400 HART
66
Hauser
10
Commissioning
10.1
Function check
Before commissioning the device, make sure that the post-installation and post-connection checks
have been performed.
• "Post-mounting check" checklist (
• "Post-connection check" checklist (
10.2
Switching on the measuring device
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup display to the
operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the section
on "Diagnostics and troubleshooting" (
10.3
Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Display/operat.
Setup
Main menu
0104-1
Language
English
Español
Français
Language
English
Deutsch
Ã
0104-1
Ã
Español
Français
Language
English
Deutsch
0104-1
Anzeige/Betrieb
Setup
Hauptmenü
Sprache
Deutsch
0104-1
mA
A0013996
å
19
Illustrated using the example of the local display