EMTEK, LLC - R100 USERS MANUAL / AUG2019.REV01
65
2.3
Remove the Blower Exhaust, and the Ethernet Cap and USB Port Plug, if applicable.
Note : To best protect the electronics of the R100 Controller, it is ideal to have the USB Port Plug always
plugged in the port, until the port is required for data acquisition. And, the Ethernet Port Cap should be
in place as well, unless the R100 is being operated remotely via ethernet connection.
3.
RAS Inlet Cover, Base, and Media Stage Sanitization:
English
WARNING:
Be careful not to saturate the air passageway opening located beneath the RAS adjustable
media stage, as this would allow the disinfectant to be drawn into the flow pathway, into the tubing, and
back to the R100 Controller flow control system and pose an electrical hazard, and damage to the R100
Controller unit.
Français
ATTENTION
: Veillez à ne pas saturer l’ouverture du passage d’air située sous l’étage du support ajustable
RAS, car cela permettrait au désinfectant d’être aspiré dans le circuit d’écoulement, dans la tubulure et de
revenir au système de contrôle de flux du contrôleur R100, et de présenter un risque électrique, et des
dommages au contrôleur R100.
3.1
The entire RAS, or just the RAS inlet cover may be autoclaved prior to each days testing if desired. If so,
place in an autoclave pouch and autoclave in a standard/qualified autoclave cycle, such as the following
examples: 121°C for 15 minutes (250°F for 15 minutes), or 115°C for 30 minutes (239°F for 30 minutes)