EMTEK, LLC - R100 USERS MANUAL / AUG2019.REV01
59
1.6.3
Remove the RAS sample inlet-cover by rotating it counter clockwise (Fig A to Fig B) and
then raise the inlet cover just high enough to place the test plate on the media stage and
remove its lid (Fig C). Without inverting, place the lid of the test plate face down on a pre-
sanitized surface next to the R100 (Fig D).
Fig A Fig B
Fig C
Fig D
NOTE:
Removing and holding the inlet cover only a few inches directly over the test plate holder
will minimize the chance of contaminants settling on the sanitized components under the
inlet cover and on the test plate during this manipulation.
1.6.4
Place the inlet-cover down over the test plate and rotate clockwise to lock it onto the inlet
cover base (Fig E). Assure that the inlet cover is properly locked and seated on the inlet
base.
Fig E
1.7
Starting the Testing Period:
1.7.1 From the RUN DISPLAY screen, press the Start button on the R100 or IR remote control to
begin the test cycle.
1.7.2 If desired, the test period can be paused/resumed by pressing the pause/resume key on the R100
or IR remote control at any time during the testing period.
1.8
Ending the Testing Period:
1.8.1 When the required volume is attained the blower motor automatically shuts off. If desired the
test period can be terminated by pressing the Stop key on the R100, or on the IR remote.
1.8.2 If desired, the test period can be Pause/Resume by pressing the Pause/Resume key on the R100
or IR remote control at any time during the testing period.