Threaded flange connection
Procedure
1. Place the customer-supplied flange and gasket on the vessel (tank) nozzle.
A
A. Gasket (customer supplied)
2. Tighten the bolts and nuts with sufficient torque for the flange and gasket.
3. Seal and protect the threads. Use anti-seize paste or PTFE tape according to site
procedures.
A gasket may be used as a sealant for BSPP (G) threaded connections.
Reference Manual
Mechanical installation
00809-0100-4030
March 2022
Rosemount 2120 Level Switch
29
Содержание Rosemount 2120
Страница 1: ...Reference Manual 00809 0100 4030 Rev GA March 2022 Rosemount 2120 Level Switch Vibrating Fork ...
Страница 4: ...4 ...
Страница 8: ...Introduction Reference Manual March 2022 00809 0100 4030 8 Reference Manual ...
Страница 14: ...Level switch overview Reference Manual March 2022 00809 0100 4030 14 Reference Manual ...
Страница 32: ...Mechanical installation Reference Manual March 2022 00809 0100 4030 32 Reference Manual ...
Страница 81: ...Reference Manual 00809 0100 4030 March 2022 Rosemount 2120 Level Switch 81 ...