3.3.3
Mounting the threaded version
Threaded vessel (tank) or pipework connection
Procedure
1. Seal and protect the threads. Use anti-seize paste or PTFE tape according to site
procedures.
A gasket may be used as a sealant for BSPP (G) threaded connections.
2. Screw the level switch into the process connection.
Note
Tighten using the hexagon nut only.
Figure 3-15: Vertical Installation
A
A. Gasket for BSPP (G) threaded connection
Figure 3-16: Horizontal Installation
A
A. Gasket for BSPP (G) threaded connection
Mechanical installation
Reference Manual
March 2022
00809-0100-4030
28
Reference Manual
Содержание Rosemount 2120
Страница 1: ...Reference Manual 00809 0100 4030 Rev GA March 2022 Rosemount 2120 Level Switch Vibrating Fork ...
Страница 4: ...4 ...
Страница 8: ...Introduction Reference Manual March 2022 00809 0100 4030 8 Reference Manual ...
Страница 14: ...Level switch overview Reference Manual March 2022 00809 0100 4030 14 Reference Manual ...
Страница 32: ...Mechanical installation Reference Manual March 2022 00809 0100 4030 32 Reference Manual ...
Страница 81: ...Reference Manual 00809 0100 4030 March 2022 Rosemount 2120 Level Switch 81 ...