20 Chapter 3 Electrical Installation
DataMate 3000 Series Air Conditioner User Manual
Chapter 3 Electrical Installation
Electrical connections to be made at the installation site are:
1. Power supply to the evaporator unit (3×L+N+PE)
2. Power supply to the condensing unit (L+N+PE)
3. Wiring for monitoring and control (if remote controls applicable)
4. Control wiring for master/standby transfer (if applicable)
All power and control wiring and ground connections must be in accordance with
the applicable local codes.
Refer to unit nameplate for full load ampere. Cable size should be in accordance
with the applicable local codes.
Mains requirement: 380Vac, 50Hz, 3×L+N+PE.
Note
1. Only trained engineer can make electrical connection.
2. Measure input power supply voltage with a voltmeter to ensure that power supply has
been disconnected before making connections.