Operating & Maintenance Instructions
17
These dates will fall into one of three categories:
1 Dates which are fixed for every year e.g. December 25
th
- programmed by absolute dd.mm
2 Dates which fall on the same day of the month every year e.g. the first Monday in May
3 Dates which vary from year to year e.g. Easter Monday - defined using dd.mm.yy
For each Exclusion Date the meter may be programmed to:
- Use the switching times for a different weekday of the current season
- Use the switching times for the same weekday but a different season
- Use the switching times for a different weekday of a different season
11.6
End of Billing (EOB)
End of Billing Reset
Time and Date Stamps for
the last three EOB records
Programmed EOB
Instantaneous EOB
Automatically on programmed dates (13) or every midnight when auto reset is enabled
At a change of season date (24)
When the deferred tariff becomes active
Daily reset
When the Billing Reset pushbutton is pressed
On command via the optical port
On command via the serial port (where fitted)
When a CT ratio programming event occurs
When the internal battery has failed at power up
When a snapshot of meter data is required to allow a bill to be prepared reflecting consumption to a
specified date, the End of Billing feature should be used.
See Section 13.3 for a description of the data captured.
A programmed Automatic End of Billing occurs at midnight.
More than one End of Billing request may occur at the same time (for example, a deferred tariff
introduced at the start of a new season), but only a single End of Billing event will take place. The
cause of each of the End of Billing events is recorded but the End of Billing Counter is only
incremented by one.
If an automatic End of Billing event should have occurred during a power down, then a billing
event will take place immediately following the next power up. If several requests were missed
then a single billing event is created, the cause reflecting all billing events that were missed.
If an End of Billing reset is required when the current tariff is manually overwritten by a new
current tariff, it should be manually requested as part of the communications session.
Содержание A1120
Страница 2: ......
Страница 3: ...A1120 40 Programmable Electronic Polyphase Meter Chapter 1 Introduction M181 001 1B 5 2009 ...
Страница 4: ...Minor Change Record Date Modification 7 5 2009 Format change ...
Страница 7: ...A1120 40 Programmable Polyphase Meter Chapter 2 Operating Maintenance Instructions M181 001 2G 5 2010 ...
Страница 8: ......
Страница 52: ...44 A1120 40 Electronic Polyphase Meter Elster Metering Limited M181 001 2G 5 2010 Figure 3 Typical Nameplate ...
Страница 53: ...Operating Maintenance Instructions 45 Figure 4 Load Curves ...
Страница 70: ......
Страница 71: ......
Страница 73: ......
Страница 91: ......
Страница 156: ......