A1120/1140 Programmable Polyphase
Meter Users Manual
_____________________________________________________________________________________
©
Elster Metering Ltd - M181 001 3C - 12/2007
50
A2 Live
Link
The live link software displays instrumentation details as
shown in the display opposite.
Using the software
Select a meter from the Meter Manager
Right click and select Live Link
Data will be read back from the meter
Note:
The Include log data in network output box in
System/Communications Server Setup/Client setup must
be checked for data to be viewed.
Содержание A1120
Страница 2: ......
Страница 3: ...A1120 40 Programmable Electronic Polyphase Meter Chapter 1 Introduction M181 001 1B 5 2009 ...
Страница 4: ...Minor Change Record Date Modification 7 5 2009 Format change ...
Страница 7: ...A1120 40 Programmable Polyphase Meter Chapter 2 Operating Maintenance Instructions M181 001 2G 5 2010 ...
Страница 8: ......
Страница 52: ...44 A1120 40 Electronic Polyphase Meter Elster Metering Limited M181 001 2G 5 2010 Figure 3 Typical Nameplate ...
Страница 53: ...Operating Maintenance Instructions 45 Figure 4 Load Curves ...
Страница 70: ......
Страница 71: ......
Страница 73: ......
Страница 91: ......
Страница 156: ......