Elnec s. r. o.
144
Maintenance
It is strongly advised to follow the instructions and precautions herein to achieve high
reliability of the programmer for a long period of time.
The programmer maintenance depends on character and amount of its use. Regardless, the
following recommendations are generally accepted:
Do not use and store the programmer in dusty places.
Humidity accelerates sedimentation of debris and dust in ZIF socket and Programming
Module Interface (PMI) connectors.
After end the job cover the ZIF socket and Programming Module Interface (PMI)
connectors.
Do not expose the programmer to direct sunlight or position near a source of heat.
Intensive daily use (programming centre, production)
Daily maintenance
Check the ZIF sockets of the programming module for their condition and wear. Remove
debris, dust and grime from the ZIF sockets with clean, dry and compressed air. Clean the
ZIF sockets both in closed and opened state.
Weekly maintenance
Perform the Selftest for every programmer or programming site.
Quarterly maintenance
Gently clean the surface of the programmer with isopropyl alcohol or technical alcohol on a
soft cloth.
Remove debris, dust and grime from the Programming Module Interface (PMI) connectors
with clean, dry and compressed air.
Perform the calibration test.
Daily use (developing laboratory, office)
Daily maintenance
After end of the job cover the ZIF socket of the programming module. It is also recommended
protecting the ZIF socket of programming modules from dust and grime.
Weekly maintenance
Check the ZIF socket of the programming modules for their condition and wear. Remove
debris, dust and grime from the ZIF sockets with clean, dry and compressed air. Clean the
ZIF sockets both in closed and opened state.
Quarterly maintenance
Perform the Selftest for every programmer or programming site.
Biannual maintenance
Gently clean the surface of the programmer with isopropyl alcohol or technical alcohol on a
soft cloth.
Remove debris, dust and grime from the Programming Module Interface (PMI) connectors
with clean, dry and compressed air.
Perform the calibration test.
Содержание BeeHive304
Страница 6: ...Elnec s r o 6 Introduction ...
Страница 10: ...Elnec s r o 10 Quick Start ...
Страница 13: ...Detailed description 13 Detailed description ...
Страница 14: ...Elnec s r o 14 BeeHive304 ...
Страница 29: ...BeeProg3 29 BeeProg3 ...
Страница 43: ...Setup 43 Setup ...
Страница 48: ...Elnec s r o 48 Step 9 Installation process will start Step 10 Click Finish button to finish setup ...
Страница 58: ...Elnec s r o 58 PG4UW software ...
Страница 125: ...PG4UWMC software 125 PG4UWMC software ...
Страница 138: ...Elnec s r o 138 Installation procedure customized ...
Страница 143: ...Common notes 143 Common notes ...
Страница 148: ...Elnec s r o 148 Troubleshooting and warranty ...
Страница 152: ...Elnec s r o Jana Bottu 5 SK 080 01 Presov Slovakia www elnec com ZLI 0330 ...