background image

Wire clips 

Wire clips are used to replace the stainless steel clips in the following situations 
 
Door:   
Wire clips are to be used on the glass behind where the door slides.  Wire clips are only needed on 
the left hand side of these sheets of glass.  See the diagram below. 

Roof vent: 

Wire clips must be used on the panes of glass either side of the vent.  The wire clips are only neces-
sary on the sides of the glass nearest to the vent.  This is because the vent side rails overlap the roof 
glazing bars.  See diagram below. 

N.B.  Stainless  steel  band clips are not required when additional optional glazing capping  is used.  
However wire clips are still necessary in the position mentioned earlier (i.e. under the vent and be-
hind the door).  The above mentioned rules apply for both toughened glass and horticultural glass.   

Содержание KENSINGTON 10 x 6

Страница 1: ......

Страница 2: ......

Страница 3: ......

Страница 4: ...zontal bracing angle 1 1 1 1 20 Door end wall bar 1 1 1 1 21 Door glazing bars marked door 2 2 2 2 22 Front glazing bars marked front 2 3 4 5 23 Corner bars taped in two packs 1 left end 1 right end 4...

Страница 5: ...ption has been chosen in preference to another This detailed assembly instruction booklet will explain the construction procedures you require to correctly install your particular structure For the pu...

Страница 6: ...2 387m 10 x 6 model 3 196m 1 915m 3 7258m 2 387m 12 x 6 model 3 814m 1 915m 4 2678m 2 387m 14 x 6 model 4 432m 1 915m 4 828m 2 387m 16 x 6 model 5 050m 1 915m 5 401m 2 387m 18 x 6 model 5 668m 1 915m...

Страница 7: ...sed to locate the position of your lean to greenhouse brick base If a brick concrete or timber base is to be laid construct it as shown ensuring that dimensions A B are not exceeded as these are the p...

Страница 8: ...he desired position ensure that it is still square by checking the diagonals again and then that it is level using a spirit level When you are sure that both are correct give the nuts a final tighteni...

Страница 9: ...ALLOY BASE ASSEMBLY Alloy base when fitted to concrete or patio floor N B The holes in the top flange of the base are drilled when the greenhouse has been erected and put onto the base...

Страница 10: ...END CORNER BARS 2 Set of glazing bars angle and cill marked END This contains Wall bar Bottom cill Glazing bars Horizontal bracing angle From the bag of assorted fittings and fitting within the box y...

Страница 11: ...for assembly purposes Side corner bar The end that is mitred and with only one hole in the flange near to the mitre is the top of the bar The bolt slots are to be on the inside for assembly purposes R...

Страница 12: ...d finger tip tighten 11 The glazing bar can now be attached to the cill in the same way as the wall bar 12 Both the glazing bar and wall bar can now be fitted to the flange in the roof corner bars In...

Страница 13: ...on of the fixing brace in to the pro truding lip of the underside of the shelf as seen on the diagram 4 Ensure that all nuts are tight Do not over tighten LEFT HAND GABLE END FRAME Please note that fo...

Страница 14: ...Using the previously inserted bolts attach the short bracing angle to the unit as shown exact distances are not required Put nuts back on and finger tip tighten all three bars 3 The door track suppor...

Страница 15: ...or the right and end in this booklet The bolt config uration of the left hand end will now be as shown below If you choose the left hand end to house the shelf and louvre then the bolt configurations...

Страница 16: ...gutter eave bar to the top of each glazing bar utilising the top bolt in each glazing bar as illustrated below 5 The cill will bolt to the bottom of the glazing bars in a similar manner Before securin...

Страница 17: ...DOOR FRAME...

Страница 18: ...t the screw through the door catch so that the serrated part is facing outwards and upwards Next slip two spring washers on to the screw and then fix the screw through the side of the door and into th...

Страница 19: ...ews The screws will go in more easily and without danger of trying to go crooked if you put a small amount of grease on the screw before assembling the doors Alternatively you could insert the screws...

Страница 20: ...ll nuts and bolts provided Position the keep so that the catch fits snugly and the doors close tightly 12 Having assembled both doors you need to attach a piece of alloy to the rear of right hand door...

Страница 21: ...side bars uppermost and the V slots of the bottom rail uppermost The top rail is arranged in such a way that the squared off end is to the bottom and the hooked hinge up permost 3 Slide the glazing b...

Страница 22: ...e angle of the roof and side are INSIDE and tight up against the bolt slots of the roof and side corner bars Key point The extra bolts inserted into the corner bar during gable end assembly can now be...

Страница 23: ...bars are secured by utilising the previously inserted bolts in the inner bolt slot of the roof corner bars 1 Attach a flat bar to the roof corner bar using the unoccupied bolt on the inner bolt slot A...

Страница 24: ...ver the bolt and then put the nut on This second flat bar will be used to attach the second glazing bar to the third and so on depending on the length of the structure you have purchased 6 Each flat b...

Страница 25: ...he angle pointing to the gutter i e the outside corner of the angle is facing inside the structure Key point To prevent the vent moving left right during operation insert a bead of silicone into the h...

Страница 26: ...t to adjust the overall length and width of the base by loosening the nuts holding the corners and moving the wall of the base slightly in or out to line up the precise position of the greenhouse Havi...

Страница 27: ...e into the plug as illustrated The structure is now ready for the final sealant There is a tube of silicon and a skeleton gun in the pack which you can now use to seal between the wall bars and ridge...

Страница 28: ...e door guide at the bottom g The door can now be adjusted slightly up or down to afford proper unhindered movement by loosening the bolts holding the door track support and moving it up and down h Bol...

Страница 29: ...lazing bar which would have been positioned between the doors N B The door track support is not utilised in a double front door 3 Offer the door track to the eaves bar directly under the gutter push r...

Страница 30: ...louvre must be fitted after the unit has been fully assembled and anchored to the wall and base and prior to glazing 2 The louvre is fitted to the wall bar and glazing bar of the fixed gable end utili...

Страница 31: ...glass Each section has a number of panes please refer to the chart on the next page for the specific sizes and quantities With each section start with the bottom pane of glass Key point insert 2 stain...

Страница 32: ...small number of stainless steel wire clips which you use im mediately behind the door i e the section of glass that the door opens on to This applies to both the horticultural and toughened glass opti...

Страница 33: ...n the panes of glass either side of the vent The wire clips are only neces sary on the sides of the glass nearest to the vent This is because the vent side rails overlap the roof glazing bars See diag...

Страница 34: ...6 WIDE LT HORTICULTURAL GLASS If the door is double fronted replace two adjoining bays of A panes from the front with 6 B panes and replace missing glass in old door end with 3 A panes...

Страница 35: ...2 1 8 x 4 24 7 4 5 2 2 2 1 10 x 4 28 8 5 5 2 2 2 1 12 x 4 32 9 6 5 2 2 2 1 REAR END If an extra louvre is added replace an A from the required position with an I and 5 x H Code Width mm Length mm A 6...

Страница 36: ...6 WIDE LT TOUGHENED GLASS PLAN Glass pane for standard door on gable end Louvre on rear end...

Страница 37: ...1 2 1 3 5 2 2 1 2 12 x 6 10 5 1 2 1 3 5 2 2 1 2 SCHEDULE 4mm TOUGHENED GLASS Code Width mm Length mm 3 610 1775 2 610 1960 36 610 1365 18 610 610 35 610 1185 19 610 457 22 573 100 21 610 140 PVC Glass...

Страница 38: ...of specialised paint to act as a further water barrier 3 Ensure that all nuts and bolts are tight and that glazing clips and overlap clips are pushed secure ly into place 4 Check that the door runs co...

Страница 39: ...OPTIONAL EXTRAS RAIN WATER KIT FOR GUTTERING...

Страница 40: ...ELITE 1407...

Отзывы: