![Eliet DZC450 Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/eliet/dzc450/dzc450_manual_2389025069.webp)
69
English
11.2. Periodic maintenance schedule
The new machine should be returned to the ELIET dealer for the first maintenance after the
first 10 hours of operation. This includes: tightening the drive belts and replacing the first
engine oil.
Thereafter, the maintenance schedule to be followed is:
"11.4. Routine check before each operation" on page 70
• "11.4.1. Visual check of the state of the machine" on page 70
• "11.4.2. Checking and topping up the engine's oil level" on page 71
• "11.4.3. Cleaning the air filter" on page 72
• "11.4.4. Checking the blades" on page 73
"11.5. Maintenance after every 25 hours of operation" on page 74
• "11.5.1. General lubrication treatment" on page 74
• "11.5.2. Changing the oil" on page 83
• "11.5.3. Checking and adjusting the belt tension" on page 84
"11.6. Maintenance after every 100 hours of operation" on page 88
• "11.6.1. Replacing the blades" on page 88
• "11.6.2. Replacing the air filter" on page 90
"11.7. Maintenance after every 200 hours of operation" on page 90
• "11.7.1. Replacing belts" on page 90
• "11.7.2. Replacing the belt tensioning roller" on page 91
• "11.7.3. Checking and/or replacing the spark plug" on page 94
"11.8. Maintenance after every 500 hours of operation" on page 95
• "11.8.1. Replacing chains and sprockets" on page 95
• "11.8.2. Chain tightening" on page 95
Содержание DZC450
Страница 1: ...DZC450 M A N U A L ...
Страница 77: ...77 English 8 3 4 6 5 2 1 11 10 9 7 ...
Страница 106: ...106 English ...
Страница 107: ...107 English ...
Страница 108: ...108 English BZ 201 460 003 10 2020 ...