4
the Scottish Development Department.
BS 5440 part 1, BS 5871 part 2 and BS 6891.
In the Republic of Ireland the installation must
also conform to the relevant standards, particu-
larly in regard to flue sizing and ventilation. Refer
to documents IS813, ICP3, IS327 and any other
rules in force.
This appliance must be installed in accordance
with the rules in force and used only in a suffi-
ciently ventilated space, and is intended for use
on a gas installation with a governed meter.
Before installation, ensure that the local distribu-
tion conditions (identification of the type of gas
and pressure) and the adjustment of the appliance
are compatible. The technical specification of this
appliance is given on the rear page of this manual.
Do not use the appliance if the glass front door
or panel has been broken, removed or is open.
Note:
Since the appliance is a source of heat, circulation
of air occurs. Therefore it is of importance that you
do not use the appliance shortly after a renovation
of the home. Because of the natural circulation
of air, moist and volatile components from paint,
building materials, carpet etc. will
be attracted. These components can settle them-
selves down onto cold surfaces in the form of soot.
Inlet pipe connection
8mm compression
Chimney requirements Balanced Flue
Flue monitor Permanent Pilot
User control: Variable rotary control inc. integrated
Piezo ignition, Permanent pilot facility, Flame fail-
ure device and Oxygen Depletion Cut-out.
Before installation of these appliances, the area
into which the fire is to be fitted must be cleared
of all debris (including dust), in particular com-
bustible material.
The appliance must sit on a hearth (or base sur-
face) sufficient to support the weight of the fire.
The firebox must then also be secured. Adjust-
able brackets are supplied on the firebox for this
purpose.
Prevention of rust:
Allways switch the fire completely off after use.
This saves gas and prevents corroding of your fire.
General Fitting Information
GENERAL INFORMATION
Содержание vesuvius 100
Страница 15: ...15 INSTALLER INFORMATION...
Страница 16: ...16 INSTALLER INFORMATION...
Страница 17: ...17 INSTALLER INFORMATION...
Страница 18: ...18 INSTALLER INFORMATION...
Страница 19: ...19 INSTALLER INFORMATION 22 USVK 100 130 REDUCER 130 100 23 USDHC 130 HORIZONTAL TERMINAL 130...
Страница 20: ...20 INSTALLER INFORMATION 24 USBI 100 130 Elbow 90 with inspection cover 25 USI 100 130 Inspection Element...
Страница 37: ...37 NOTES...
Страница 42: ...42 NOTES...
Страница 43: ...43 NOTES...
Страница 44: ...Element4 B V Paxtonstraat 23 8013 RP Zwolle The Netherlands September 2014...