6
USER INFORMATION
3
B
A
MAN position
By briefly pressing the SET button, you will go
through the following functions:
MAN →
✹
TEMP → TEMP → (P*)TIMER →
MAN
where, depending on the timer setting:
(P*) is displayed as P1 , , P1 , P2
✹
,
P2 .
You can also go back to the MAN position by
pressing the button
or
!Caution - When pressing the buttons (with the
exception of the SET button), the transmission
symbol ( ) will appear to indicate that
transmission is taking place between the remote
control and the receiver;
- The receiver acknowledges the transmission
with a sound signal;
- The appliance will automatically enter the
standby position, if there is no transmission for
6 hours.
Set the remote control to the MAN position.
Ignition
Caution - During the ignition process, you are not
allowed to operate control button B
on the gas control manually
- Always wait 5 minutes after the pilot burner
has gone out, before you re-ignite
the appliance;
I g n i t e t h e a p p l i a n c e a s f o l l o w s ;
Simultaneously press the buttons
and
on the remote control.
Let go of the buttons when a short sound
signal indicates that the ignition process has
been started.
In succession:
- the continuous signals will indicate that the igni-
tion process is active;
- a short sound signal will indicate that the ignition
process has finished;
- the appliance will automatically switch through
to the highest position of the main burner, which
will start to burn in a few seconds.
Caution - If the pilot burner is not burning after
3 ignition attempts, you must close the gas tap
and call the installer;
- When igniting the pilot burner, you will hear
sound signals. After the last short sound sig-
nal, the main burner should be largely ignited
within about 10 seconds. If this is not the
case, you must close the gas tap and warn
your installer;
- If the appliance ignites with a pop sound, you
must close the gas tap and
contact your installer.
!Tip A little motor will start to run when the
main burner operates, you will be able to hear
it.
A
B
Содержание vesuvius 100
Страница 15: ...15 INSTALLER INFORMATION...
Страница 16: ...16 INSTALLER INFORMATION...
Страница 17: ...17 INSTALLER INFORMATION...
Страница 18: ...18 INSTALLER INFORMATION...
Страница 19: ...19 INSTALLER INFORMATION 22 USVK 100 130 REDUCER 130 100 23 USDHC 130 HORIZONTAL TERMINAL 130...
Страница 20: ...20 INSTALLER INFORMATION 24 USBI 100 130 Elbow 90 with inspection cover 25 USI 100 130 Inspection Element...
Страница 37: ...37 NOTES...
Страница 42: ...42 NOTES...
Страница 43: ...43 NOTES...
Страница 44: ...Element4 B V Paxtonstraat 23 8013 RP Zwolle The Netherlands September 2014...