What is important to provide for a
correct installation
1.
Forsee a coverage for external installation
2.
a good ventilation in case of internal installation and respect a minimum
distance to the wall (
at least 45-50 cm
)
3.
Respect the inclination of pipes (
12mm every meter
)
4.
Respect the lenght of pipes
(max 15/18 meters
)
5.
Respect the siphon every 5 meters in height
(low pressure side)
6.
Respect the pipe diameter starting from the remote cooling unit till to appliance.
7.
Respect the correct installation of the solenoid valve
(in the new release of main
board it must be installed near the evaporator to avoid that liquid goes back to
the compressor)
8.
Respect the suggested environment temperature
(- 4°/40°C or ask a special
code)
Содержание BLAST CHILLER LW
Страница 1: ...BLAST CHILLER LW 595R18700 ...
Страница 3: ...Electronic control Cruise version CRUISE version ...
Страница 53: ...Blast Chiller or Freezer First point installation Code check Safety device Description ...
Страница 92: ...Remote cooling unit information What you must know to respect a correct installation ...
Страница 102: ... T1 T2 AP AP AT AT Electrical connection Find the terminals inside the electrical box ...