OPERATION
01/2020
-31-
NP_AD500-2250-1_01_2020
“RUN MODE” screen
PDP
– pressure dew point level
RUN HRS - total dryer operating (cycling) time
TME-to-MT
– time until the next service interval
“STAND BY MODE” screen
PDP
– pressure dew point level
RUN HRS - total dryer operating (cycling) time
This screen is not backlit
“ECONOMY RUN MODE” screen
TIME
– time remaining until the end of economy
mode (maximum duration limit)
PDP
– pressure dew point level
RUN HRS - total dryer operating (cycling) time
TIME-to-MT
– time until the next service interval
Indication of an upcoming service interval
100 hours prior to the next service interval, the
back lighting changes from white to orange and
the display shows the message “SERVICE DUE
IN XY HOURS”, where XY indicates the
remaining number of hours until service is due.
RUN HRS - total dryer operating (cycling) time
(RUN mode)
Содержание AD2250
Страница 1: ...AD500 2250 User manual N vod na pou itie...
Страница 2: ......
Страница 4: ...CONTENTS 5 OBSAH 46...
Страница 14: ...PRODUCT DESCRIPTION NP_AD500 2250 1_01_2020 14 01 2020 Valve switching diagram ECONOMY mode...
Страница 16: ...PRODUCT DESCRIPTION NP_AD500 2250 1_01_2020 16 01 2020 Fig 2 Dryer AD1500 Fig 3 Dryer AD2250...
Страница 55: ...POPIS V ROBKU 01 2020 55 NP_AD500 2250 1_01_2020 asov diagram prep nania ventilov re im ECONOMY...
Страница 57: ...POPIS V ROBKU 01 2020 57 NP_AD500 2250 1_01_2020 Obr 2 Su i AD1500 Obr 3 Su i AD2250...
Страница 90: ......
Страница 91: ......