2-1
System Description
2.0 Number References
Component
Edmunds Gages Number
Basic Accusetter II Unit
E9300
(2) Channel LVDT Signal Conditioning Module
E9310
(4) Channel LVDT Signal Conditioning Module
E9320
(1) Channel A/E Signal Conditioning Module
E9330
(2) Channel A/E Signal Conditioning Module
E9340
Power Cable
4550111
Air Filter/Regulator Assembly
5801302
Interface Cable
4550200
Printer Cable
5809060
Power Jumper Cable
4550120
I/O Accessory Board
5911013
Send Data Foot Switch*
5911100
TIR Reset Foot Switch*
5911101
Auto Air Shutoff Kit (Optional)
5913250
Includes: Valve Assembly
5911200
Shutoff Cable*
5911018
*Note: Foot switch and air shutoff cables must be plugged into the "In/Out B" port.
A new Accusetter II will be supplied with an E9310, E9320, E9330, or E9340 signal
conditioning module, however the Accusetter II is compatible with the obsolete
signal conditioning modules listed below:
Obsolete Signal Conditioning Modules
Edmunds Gages Number
(2) Channel LVDT Signal Conditioning Module
E9010
(4) Channel LVDT Signal Conditioning Module
E9020
(1) Channel A/E Signal Conditioning Module
E9030
(1) Channel A/E Signal Conditioning Module
E9031
(2) Channel A/E Signal Conditioning Module
E9040
(2) Channel A/E Signal Conditioning Module
E9041
Power to the column must be turned off prior to installing or removing a signal
conditioning module.
Содержание Accu-Setter II
Страница 2: ...A Accu Setter II User s Manual Edmunds GAGES...
Страница 16: ...2 3 2 3 Overall E9300Unit Figure 2 1 Accusetter II Basic Unit E9300...
Страница 18: ...2 5 Figure 2 2 Front Panel...
Страница 20: ...2 7 Figure 2 3 Rear Panel...
Страница 31: ...3 3 Front Mounting Foot Rear Mounting Bracket Figure 3 1 Base Feet Figure 3 2 Filter Regulator Mounting...
Страница 32: ...3 4 Figure 3 3 Air Connections For Air Gaging Application Only...
Страница 39: ...3 11 An example of various multipliers as related to diameter measurement follows...
Страница 40: ...3 12 The last consideration to complete the formula is the gaging function See examples below...
Страница 43: ...PROGRAMMING SINGLE CHECK MEASUREMENT 3 15...
Страница 44: ...PROGRAMMING SINGLE CHECK MEASUREMENT 3 16...
Страница 50: ...PROGRAMMING MULTIPLE CHECK MEASUREMENT 3 22...
Страница 51: ...PROGRAMMING MULTIPLE CHECK MEASUREMENT 3 23...
Страница 59: ...PROGRAMMING MULTIPLE FIXTURE MEASUREMENT 3 31...
Страница 60: ...PROGRAMMING MULTIPLE FIXTURE MEASUREMENT 3 32...
Страница 90: ...4 5 Figure 4 3 A E Block...
Страница 93: ...4 8 Figure 4 5 Input Output Jumpers...