13
Attach branch duct and fresh air duct collars to cassette
chassis using following steps.
Recommend install no more than 10 feet (3m) of branch
duct or fresh air duct.
1.
Locate knock-out holes. See Figure 12.
Number of knockouts vary with unit size.
• Branch duct knock-outs are 5¼” (133mm) round.
• Fresh air knockouts are:
a. 1¼” x 2½” (32 x 64mm) rectangular models 9
& 12.
b. 3” (76mm) square models 18 thru 36
3.
Cut black insulation around knock-out. See Figure 13.
4.
Snip tabs holding knock-out in place.
5.
Remove metal knock-out and black insulation behind
it.
6.
Attach field supplied duct collars to chassis using self-
drilling screws.
7.
Repeat above steps for remaining duct work.
figure 12 - Knockouts
fresh air
knockout
branch Duct knockout
Cassette 9-12
Cassette 18 - 36
figure 13 - Cut Insulation And Snip Out
Knockouts
DUCT ConnECTIonS
Содержание EMI Ductless CAHV Series
Страница 51: ...51 Notes ...
Страница 52: ...Phone 1 800 228 9364 Fax 1 800 232 9364 2201 Dwyer Avenue Utica NY 13501 ...