24
CAHV Units
• Set controller functions before proceeding with start-up.
• Follow instructions beginning on page 26.
Test Cooling Operation
Operation of the unit depends on the room temperature.
It may be necessary to warm the room before testing the
unit’s cooling abilities.
When power is first applied to the control or after a power
outage there is a three (3) minute delay before the com-
pressor or electric heat will energize. This is to protect the
unit from short cycling.
Perform Complete Inspection
System Electrical Verification
• Turn off all power to the indoor and outdoor units.
• Remove any tools or other obstructions.
1.
Inspect all electrical connections.
2.
Separate any lines that contact each other.
3.
Replace control panel cover, filters and grilles.
4.
Test each power and circuit connection before powering
system.
perform Electrical Circuit Checks
1.
Turn cassette unit ON. verify fan cycles correctly.
2.
Models CAHv 18-24 only — Check motorized vane
operation.
3.
Units with electric heat, check operation of heating
elements by setting system to heating mode.
Adjust thermostat setpoint >2°F (1°C) above room
temperature.
4.
Follow outdoor unit start-up procedure as directed in
unit’s instruction manual.
5.
Turn power on to indoor and outdoor units.
Verify Condensate Pump Operation
InITIAL START-Up — CAHV UnITS
WARnIng
Electrical shock hazard. Turn off power to indoor and
outdoor units before proceeding. Failure to follow
these instructions could result in death or serious
injury.
!