![ECR EMI Ductless CAHV Series Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/ecr/emi-ductless-cahv-series/emi-ductless-cahv-series_installation-operation-and-maintenance-manual_2356039009.webp)
9
Blanking off
Fascia discharge slot(s) need blanking off when ducts are
used to channel conditioned air to other areas.
• Position two polystyrene blanking off strips (provided)
in fascia discharge slots to direct air to ducts.
• Up to two non-adjacent sides may be blanked off.
If fascia discharge slot needs blanking off —
1.
Remove inlet grilles and filters. See Figure 4 and
Figure 2, Page 9.
2.
Turn fascia over to expose polystyrene insulation. See
Figure 3.
3.
Push one polystyrene blanking-off pieces into recess in
polystyrene fascia insulation.
MoUnTInG THE UnIT
figure 2 - Model 18 - 24 — Two Hinged Grilles
And Two filters
hinge
figure 3 - Applying Blanking-off pieces
blanking-off
Pieces
figure 4 Models 9–12 — One grille & One filter
Содержание EMI Ductless CAHV Series
Страница 51: ...51 Notes ...
Страница 52: ...Phone 1 800 228 9364 Fax 1 800 232 9364 2201 Dwyer Avenue Utica NY 13501 ...