•
ECB - NOSE LDG GEAR (L AFT Bus)
•
ECB - L MAIN LDG GEAR (L AFT Bus)
•
ECB - R MAIN LDG GEAR (L AFT Bus)
D. Scroll to ENGINE using outer knob. Press inner knob to select. Scroll to the listed ECB
using outer knob and highlight. Push “RESET” Soft key. Press “CONFIRM RESET” soft
key.
•
ECB - L ENG FIRE EXTNGR (L FWD Bus)
•
ECB - R ENG FIRE EXTNGR (R FWD Bus)
E. Power down the aircraft by setting the SYS BATT and START BATT switches to OFF
and the BUS TIE to OPEN.
F. Disconnect WOW Box from aircraft. Refer to AMM-20-00-04-051-801 – Weight On
Wheels (WOW) Box - Connect/Disconnect.
G. If on jacks, lower aircraft and remove jacks. Refer to
AMM-07-10-00-051-801 – Jacking -
H. If applicable, call the local control tower and tell them the transponder test is complete.
I.
Remove all tools, equipment and unwanted material from work area.
J.
Disconnect external power. Refer to
AMM-24-40-00-051-801 – External Power -
K. If all other maintenance is complete, return aircraft to service. Refer to
AMM-20-00-02-051-801 – Return To Service (After Maintenance).
EA500 Aircraft Maintenance Manual — 06-117751
Temporary Revision No. 34-21
EFFECTIVITY: 0001-0104, 0113-0115, 0120, 0123-0124
POST SB 500-99-002; AND 0105-0112,
0116-0119, 0121-0122, 0125-0262 PRE SB
500-99-005
34-50-20
CONFIG B
Page 536
Sep 30/20
© 2020 Eclipse Aerospace, Inc.