GPS - INSTALLATION
AMM-34-50-11-041-801-D
1.
General
A. This task gives the procedure to install the Global Positioning System/Wide Area
Augmentation System (GPS/WAAS) sensors.
B. There are two GPS/WAAS sensors installed in the aircraft. Installation steps are the
same for the light and right sides, unless specified.
2.
Job Set-Up
SUBTASK AMM-34-50-11-041-D-921-001
A. Make sure the aircraft is in the same configuration it was when the removal task was
AMM-34-50-11-001-801 – GPS - Removal.
3.
Procedure
SUBTASK AMM-34-50-11-041-D-411-001
(Refer to
and align the bolt holes.
(1) Make sure the electrical connectors are facing forward.
(2) For the left side sensor, make sure the GPS/WAAS sensor
toward the outboard side of the aircraft and against the mounting bracket
.
(3) For the right side sensor, make sure the GPS/WAAS sensor
mounting flange is
toward the inboard side on the aircraft and away from the mounting bracket
.
.
(1) For the left side GPS/WAAS sensor
to the mounting
.
(2) For the right side GPS/WAAS sensor
and spacers
.
C. Torque the bolts
to between 30-40 lbf.in (3.4-4.5 Nm).
D. Bond the GPS/WAAS sensor
Electrical Bonding - Maintenance Practices.
(1) Make sure the resistance is not more than 2.5 millohms.
E. Remove the protective caps from the electrical connector
and Coax Threaded Neil-
F. Connect the electrical connector
G. Apply power to the aircraft. Refer to
AMM-24-40-00-051-801 – External Power -
EA500 Aircraft Maintenance Manual — 06-117751
Temporary Revision No. 34-21
EFFECTIVITY: ALL POST MB 500-31-007 OR MB
500-31-008
34-50-11
CONFIG D
Page 401-Inst
Sep 30/20
© 2020 Eclipse Aerospace, Inc.