![Echelon LONWORKS PLT-22 Скачать руководство пользователя страница 126](http://html1.mh-extra.com/html/echelon/lonworks-plt-22/lonworks-plt-22_user-manual_3897121126.webp)
B-8
Appendix B
Product Qualification - EMC
Item Check
When
Completed
Description
57
Proper measurement of conducted emissions is used to verify
compliance with FCC Part 15 and/or CENELEC EN 50065-1
as described in chapter 5.
58
A
50
Ω
//(50µH+5
Ω
) Line Impedance Stabilization Network
(LISN) as specified in
CISPR Publication 16
, second edition
is used for measurement.
59
The appropriate attenuator is used to ensure that the
transceiver's transmit signal does not overload the
measurement apparatus. The residual noise floor of the
entire measurement set is verified to be at least 10dB below
the specification limit (a noise floor less than 38dBµV for
FCC measurements, and a noise floor less than 36dBµV for
CENELEC EN 50065-1 measurements).
60
Measurements are made with a quasi-peak detector and the
average detector as specified in
CISPR Publication 16
.
61
FCC measurements are made with a 9kHz bandwidth filter
as specified. The CENELEC EN 50065-1 measurements are
made with a 200Hz bandwidth filter for measurements
below 150kHz, and a 9kHz bandwidth filter for
measurements above 150kHz.
62
For EN50065-1 verification all testing is done with a
Rohde&Schwarz EMI Test Receiver ESHS30 (or equivalent
tester with proper filter skirts) set to manual mode using a
set-up program described in chapter 5. Alternatively,
Hewlett Packard equipment is used with an appropriate
external filter.
Product Qualification - Electromagnetic Immunity and
Communication Performance
Item Check
When
Completed
Description
63
The product is tested to appropriate levels of either
CEI/IEC 1000-4-5, or IEEE C62.41-1991.
64
The product is verified to meet communication performance
capabilities per chapter 7.
Содержание LONWORKS PLT-22
Страница 6: ...iv Echelon...
Страница 14: ...1 8 Introduction...
Страница 67: ...LONWORKS PLT 22 Transceiver s User Guide 5 7 Figure 5 3 Capacitor Input Power Supply Schematic...
Страница 92: ...6 10 Design and Test for Electromagnetic Compatibility...
Страница 110: ...7 18 Communication Performance Verification...
Страница 114: ...8 4 References...
Страница 118: ...A 4 Appendix A...