The Eaton xStorage 400 is designed to operate for extended periods of time without maintenance. All xStorage
400 maintenance activities are to be performed by authorized service personnel only. Preventive maintenance
is performed per the schedule in paragraph
Preventive Maintenance Schedule
; corrective maintenance is
performed on an as-needed basis.
99..11..11
IIm
mppoorrttaanntt S
Saaffeettyy IInnssttrruuccttiioonnss
Due to the presence of batteries, the xStorage 400 interior is unsafe until the DC power source is
disconnected, and the electrolytic capacitors are discharged. After disconnecting the utility power and the DC
power, authorized service personnel should wait at least five minutes for capacitor to bleed off before
attempting any internal access.
Servicing and maintenance should be performed by qualified service personnel only.
Because each battery string is an energy source, opening the battery circuit breaker does not de-energize the
voltage within the battery string.
DO NOT ATTEMPT TO ACCESS ANY INTERNAL AREA OF THE BATTERY
STRING YOURSELF. VOLTAGES ARE ALWAYS PRESENT IN THE BATTERY STRING.
If you suspect that a
battery string needs service, contact an Eaton service representative.
99..22
P
Prreevveennttiivvee M
Maaiinntteennaannccee S
Scchheedduullee
To ensure reliable operation, the inverter cooling inlet and outlet filters must be kept clear. Do not permit
obstructions (equipment, vehicles, snow) to block these areas.
Preventive maintenance procedures are recorded in the Service Manual. The table below contains the
preventive maintenance activities for the xStorage 400.
Table 9. Maintenance Schedule
Periodicity
Activity
Details
Quarterly
Filter check
•
Replace inverter cooling inlet filters.
•
Inspect inverter cooling outlet filters.
•
Inspect hydrogen vent filters.
Battery system
•
Inspect battery system.
•
Validate charger output voltage.
Annually
Cabinet inspection
•
Inspect & clean the interior and exterior of the system.
•
Torque check select electrical connections.
Содержание xStorage 400
Страница 6: ...vi Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Table of Contents...
Страница 8: ...viii Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Figures...
Страница 10: ...x Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Tables...
Страница 32: ...22 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Inspecting and Unpacking...
Страница 56: ...46 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Hydrogen Mitigation Procedure...
Страница 66: ...56 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Predict Pulse Dashboard...
Страница 86: ...76 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Warranty...
Страница 95: ...Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 85 Battery Safety Data Sheets...
Страница 96: ...P 16400103201 P 164001032 01...