Eaton xStorage 400 Installation and Operation Manual P-164001032—Rev 01
39
55..44
D
Diisscchhaarrggiinngg M
Mooddee
When select programmable conditions are met, the xStorage 400 will discharge its internal batteries. The
current path is the reverse path described in Chapter 5.2.
The batteries will continue to discharge until the load drops below the programmed condition, programmed
time windows expire, or the programmed minimum SOC is reached.
Figure 24. Path of Current Through xStorage 400 — Discharging Mode
DC - DC
Converter
Energy Conversion Modules (ECMs)
Inverter
Main Power Flow
(Discharging)
Trickle Current
Energized
Digital Metering and
Environmental Controls
and Systems Power
AC Input /
Output
Environmental
Controls/Systems
Battery
Digital Metering
Содержание xStorage 400
Страница 6: ...vi Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Table of Contents...
Страница 8: ...viii Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Figures...
Страница 10: ...x Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Tables...
Страница 32: ...22 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Inspecting and Unpacking...
Страница 56: ...46 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Hydrogen Mitigation Procedure...
Страница 66: ...56 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Predict Pulse Dashboard...
Страница 86: ...76 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Warranty...
Страница 95: ...Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 85 Battery Safety Data Sheets...
Страница 96: ...P 16400103201 P 164001032 01...