Eaton xStorage 400 Installation and Operation Manual P-164001032—Rev 01
21
33..33
IInnssppeeccttiinngg aanndd U
Unnppaacckkiinngg
1.
Carefully inspect the outer packaging for evidence of damage during transit.
2.
Use a forklift to move the packaged cabinet to the installation site, or as close as possible, before
unpacking.
3.
Remove the protective covering from the cabinet.
4.
Remove the packing material, and discard or recycle in a responsible manner.
5.
Inspect the contents for any evidence of physical damage, and compare each item with the Bill of
Lading. If damage has occurred or shortages are evident, contact an Eaton service representative
immediately to determine the extent of the damage and its impact on further installation.
Содержание xStorage 400
Страница 6: ...vi Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Table of Contents...
Страница 8: ...viii Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Figures...
Страница 10: ...x Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 List of Tables...
Страница 32: ...22 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Inspecting and Unpacking...
Страница 56: ...46 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Hydrogen Mitigation Procedure...
Страница 66: ...56 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Predict Pulse Dashboard...
Страница 86: ...76 Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 Warranty...
Страница 95: ...Eaton xStorage 400 Installation and Operation Manual P 164001032 Rev 01 85 Battery Safety Data Sheets...
Страница 96: ...P 16400103201 P 164001032 01...